
POST DEPLOYMENT:
Turn over the day-to-day activities associated with the scheduling and installation of hardware and software, changes to configuration, and de-installation and relocation of equipment to the capable hands at Lenovo.
2/27-3/1二二八連續假期間,Lenovo將暫停所有客服以及運送服務;您的訂單商品送達日可能稍有變動。商品配達前請您耐心等候,感謝您的體諒!

Turn over the day-to-day activities associated with the scheduling and installation of hardware and software, changes to configuration, and de-installation and relocation of equipment to the capable hands at Lenovo.


