What Is Cloud Migration
Summary
Cloud migration is the process of moving applications, data, and supporting IT resources from an existing environment to a cloud computing environment. It typically involves moving workloads from on-premises infrastructure to the cloud or between cloud environments.
This article explains which resources can be migrated, the main migration strategies, and the stages of cloud migration. It also covers reasons for migration, technical challenges, and the role of cloud migration services.
What Can Be Migrated to the Cloud
Cloud migration can involve individual workloads or interconnected application environments. The resources involved depend on what an application needs to operate in its destination environment.
Common resources include:
- Applications: Business software, web applications, and internal tools.
- Databases and files: Application records, documents, and stored information.
- Computing environments: Virtual machines, operating systems, and application runtimes.
- Supporting configurations: Network connections, access permissions, storage settings, and integrations.
An application that depends on a database and an authentication service may require coordinated changes to all three components. Dependencies remaining on-premises also need connectivity to the migrated application.
Workloads can move to public or private cloud environments. Organizations may also retain selected systems on-premises as part of a hybrid cloud architecture.
The changes required depend on destination compatibility and the migration strategy. Moving stored data does not always involve moving the software that uses it. Similarly, an application moved to the cloud still needs access to its required data sources.
What Are the Main Cloud Migration Strategies
Cloud migration strategies define whether an application moves with limited changes, undergoes modification, or remains in its existing environment.
A common framework describes seven approaches, known as the seven Rs:
- Rehosting: Moving an application to cloud infrastructure with minimal architectural changes. This approach is also called lift-and-shift migration.
- Replatforming: Changing selected platform components during migration, such as moving to a compatible managed database service without redesigning the whole application.
- Refactoring or re-architecting: Modifying application code or architecture to use different cloud services or deployment patterns.
- Relocating: Transferring compatible virtualized workloads or environments to a cloud platform while preserving much of their existing configuration.
- Repurchasing: Replacing an existing application with another software product, often delivered as software as a service (SaaS). Related data may still need transferring.
- Retaining: Keeping an application in its existing environment because of dependencies, technical constraints, or operational requirements.
- Retiring: Decommissioning an application that is no longer needed, with relevant data retained or archived where required.
Retaining and retiring are application portfolio decisions rather than direct transfers. Organizations may apply different strategies to different workloads based on compatibility, dependencies, and operating requirements.
How Does the Cloud Migration Process Work
The cloud migration process moves from workload assessment and planning to environment preparation, transfer, cutover, and validation. The stages can overlap depending on the applications involved.
Assess Applications and Infrastructure
Technical teams inventory applications, servers, databases, and supporting systems. They examine software versions, computing resource usage, data volumes, and connections between workloads.
Dependency mapping identifies services that need to move together or remain connected after migration. Teams also assess data handling requirements and acceptable downtime, which influence transfer and cutover methods.
Plan the Migration Approach
Planning establishes the destination environment, migration strategy, transfer methods, and testing requirements. Workloads can be grouped into migration waves according to their dependencies.
The plan also defines acceptable service interruptions, cutover steps, and fallback arrangements if the transfer encounters problems. Testing criteria specify how teams will verify application functions and data after transfer.
Prepare the Cloud Environment
Before transfer, technical teams configure computing resources, storage, networking, identity permissions, and security controls. They also establish monitoring and data protection arrangements according to workload requirements.
Connectivity and application compatibility checks help identify configuration issues before production cutover. Network addresses, service endpoints, and identity settings must support connections to systems that remain outside the cloud.
Transfer Applications and Data
Transfer methods vary by workload. Virtual machines can be replicated or recreated on compatible cloud infrastructure. Applications can be redeployed with updated configurations and dependencies.
Files can be copied over supported network connections, while databases can use backup and restore, export and import, or replication.
For databases that continue receiving updates, an initial copy may be followed by replication of subsequent changes. This supports synchronization before the application switches to the destination environment.
Data volume, available bandwidth, and compatibility influence the transfer method and duration. Application migration also involves confirming that configuration settings, permissions, and connections to related systems work in the destination.
Test and Complete Cutover
Teams test application functions, database connections, authentication, integrations, and data consistency.
Once acceptance requirements are met, cutover redirects production operations or user traffic to the cloud environment. Depending on the application, this may involve a final synchronization, routing change, or planned interruption.
Established fallback procedures address cutover problems.
Validate Migrated Workloads
After cutover, teams monitor service availability, application errors, resource use, and response times. They verify that data and dependent systems remain accessible.
The source environment can be decommissioned after validation and applicable retention requirements are completed.
Why Do Organizations Migrate to the Cloud
Organizations migrate workloads to change how computing resources are hosted and managed. The reasons depend on existing infrastructure and application requirements.
- Cloud resource access: Cloud environments provide configurable computing, storage, and networking resources.
- Infrastructure management: Managed services can transfer selected platform maintenance responsibilities to a cloud provider, depending on the service model.
- Deployment location: Supported cloud regions provide choices for workload placement, subject to connectivity and data requirements.
- Application modernization: Some migration strategies introduce managed databases, application platforms, or revised application architectures.
- Operating model changes: Moving workloads can change how infrastructure is provisioned, monitored, and maintained.
Cost and performance outcomes depend on application design, service configuration, resource usage, and ongoing management.
What Are the Main Challenges of Cloud Migration
Cloud migration involves technical and operational conditions that affect workload transfer and application operation.
- Compatibility: Existing software, operating systems, or platform components may require changes in the destination environment.
- Application dependencies: Shared databases, identity services, and connected applications need coordinated migration or continued connectivity.
- Data transfer: Large datasets and continuously updated databases require suitable transfer capacity, synchronization, and validation.
- Service interruption: Cutover may interrupt access while applications or data connections switch environments.
- Security and compliance: Identity permissions, network controls, encryption, logging, and applicable data residency requirements influence migration planning.
- Costs: Planning, data transfer, testing, cloud resources, software licensing, and ongoing operations contribute to migration costs.
Addressing these conditions during assessment helps teams select transfer methods, establish acceptance requirements, and plan workload-specific migration activities.
What Do Cloud Migration Services and Specialists Do
Cloud migration services support workload assessment, migration planning, environment preparation, data transfer, testing, and cutover. Their scope depends on the provider and the activities agreed upon.
Cloud migration specialists may examine application compatibility, configure transfer tools, coordinate data synchronization, or validate migrated workloads.
Consulting activities generally address migration strategies, destination architecture, and workload sequencing. Internal IT teams, external specialists, or both can carry out these tasks.
Conclusion
Cloud migration transfers applications, data, and supporting IT resources into a cloud environment. It involves selecting a migration strategy, preparing the destination, transferring workloads, and validating application operation.
The approach depends on system compatibility, application dependencies, data requirements, and operational constraints. These factors determine how workloads move and how their operation is checked after cutover.
Frequently Asked Questions
What is cloud migration in cloud computing?
Cloud migration is the transfer of applications, databases, data, and supporting IT resources into a cloud environment. Workloads can move from on-premises infrastructure or between cloud environments. Migration includes planning, resource preparation, transfer, and validation after cutover.
What types of workloads can be migrated to the cloud?
Organizations can migrate business applications, web applications, databases, virtual machines, files, and storage workloads. Network settings, access permissions, and application integrations may also require changes. Destination compatibility and application dependencies determine the resources involved.
How do organizations prepare workloads for cloud migration?
Preparation includes reviewing applications, software compatibility, resource requirements, data, and dependencies. Teams then select migration strategies, configure destination infrastructure, define transfer methods, and establish cutover and testing requirements before moving production workloads.
How are application dependencies identified before migration?
Teams examine connections among applications, databases, authentication services, networks, and supporting infrastructure. Configuration records, monitoring information, and discovery tools help identify these relationships. Dependency mapping informs migration sequencing and required connections after transfer.
Why do organizations migrate applications to the cloud?
Organizations migrate applications to access configurable cloud resources, use selected managed services, or change workload deployment locations. Some migrations involve application modernization. The operational results depend on workload requirements, migration strategy, and cloud configuration.
How are applications and virtual machines migrated to the cloud?
Virtual machines may be replicated or recreated on compatible cloud infrastructure. Applications may be redeployed with updated software configurations or service connections. The method depends on the existing environment, destination capabilities, and selected migration strategy.
What are the main strategies used for cloud migration?
The seven Rs are rehosting, replatforming, refactoring, relocating, repurchasing, retaining, and retiring. They cover moving workloads, modifying applications, replacing software, keeping systems in place, or decommissioning unused applications. Not every strategy involves a direct cloud transfer.
How are databases and files transferred during cloud migration?
Files can be copied through supported network connections. Database transfer methods include backup and restore, export and import, and replication. The choice depends on data volume, system compatibility, available bandwidth, and application availability requirements.
How is data consistency maintained during cloud migration?
Data consistency is checked through synchronization and validation. When supported, replication transfers database updates made after an initial copy. Teams verify synchronization status and compare relevant records before cutover, using checks appropriate to the application and database.
What happens during cloud migration cutover?
Cutover switches production processing or application traffic to the cloud environment. Activities can include final data synchronization, network routing changes, and application activation. Teams then verify access and functionality, following fallback procedures if acceptance requirements are not met.
How are security controls managed during cloud migration?
Teams review identity permissions, network access, encryption settings, and logging requirements before transfer. Applicable controls are configured in the destination environment and checked during testing. Security requirements also influence transfer methods and workload placement.
How are migrated workloads tested and validated?
Validation checks application functions, database records, authentication, network access, integrations, and performance against defined requirements. After cutover, monitoring tracks errors, service availability, and resource usage. Teams resolve identified issues before completing migration closure activities.